Contact Us Who We Help
FAIRFIELD, Conn. – JUNE 5, 2025, BNP Associates, Inc. (“BNP” or the “Company”) a leading air transportation design and engineering firm backed by Godspeed Capital Management LP (“Godspeed Capital”), today announced the acquisition of Establish, Inc. (“Establish”), a global consulting firm specializing in warehousing and supply chain logistics. The acquisition of Establish strengthens BNP’s capabilities […]
June 23, 2025
Hongkong Post will redevelop the existing Airmail Center at Hong Kong International Airport, and BNP was engaged to provide consultancy services for a redevelopment feasibility study.
June 23, 2025
In 2017, BNP partnered with the local consultancy firm Sinotech to provide postal automation design services for the Northern Taiwan Mail Processing Center.
June 23, 2025
Etihad Airport Services Cargo (EASC) retained BNP to provide data analysis, design, simulation, engineering, tendering, and construction support for a new air cargo terminal (EMCT) and a forward cargo staging facility.
June 23, 2025
MATAR has engaged BNP and Middle East architecture and engineering firm Dar Al-Handasah to deliver data analysis, design, simulation, engineering, tendering, and construction support for a new multi-level air cargo terminal (Terminal 2).
June 23, 2025
MNG Airlines engaged BNP for a feasibility study to develop two facilities for E-commerce and warehousing.
June 23, 2025
National Unified Procurement Company (NUPCO) retained BNP and leading Middle East A&E firm Dar Al-Handasah for data analysis, design, engineering, and tendering services for a new pharmaceutical logistics hub.
June 23, 2025
The Perishable Handling Center (PHC) at Muscat International Airport was developed to support the airport’s growing cargo needs, as current facilities won’t be able to keep up with future demand.
June 23, 2025
Red Sea Global, a Public Investment Fund company, retained BNP and the leading Middle East A&E firm Dar Al-Handasah for data analysis, feasibility study validation, design, engineering, and tendering services for a warehouse solution intended for a resort distribution center and controlled commodities warehouse.
June 23, 2025
BNP was retained by Ethiopian Airlines to provide a conceptual design, validate the detailed design and review of shop drawings, provide construction administrative services on-site, manage the installation, and provide testing and commissioning, as well as closeout, support during the handover of the new E-Commerce Facility.