Skip To Content Privacy Page

BNP in Action—News, Projects & Progress

image overlay BNP Turns 55!
Story

Story

BNP Turns 55!

Innovation, Growth, and Global Impact What began with three engineers at drafting tables has grown into one of the world’s leading aviation consultancies. This year, BNP marks 55 years since Morton “Morty” A. Breier, Arnold S. Neidle, and Enrico “Ric” A. Patrone founded the firm with a shared belief that great design and rigorous thinking […]

Back to Blog

Solution: Baggage Handling Systems

March 8, 2026

King Abdulaziz International Airport (JED) Baggage Handling System Expansion Masterplan

BNP developed an airport Baggage Handling System (BHS) masterplan for the King Abdulaziz International Airport (KAIA).

March 7, 2026

Terminal Modernization Project at Pittsburgh International Airport (PIT)

Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise supporting design review, TSA compliance, commissioning, and operational readiness for the Terminal Modernization Program.

March 7, 2026

Atlanta-Hartsfield International Airport (ATL) L-MOD Curbside Design

BNP Associates, working with HOK, redesigned the southeast curbside conveyors and Delta Dash package handling systems to make room for new canopy supports being added as part of the L-MOD program.

March 7, 2026

Hong Kong International Airport (HKG) Third Runway System Baggage Handling System

To meet future air traffic growth, the Airport Authority of Hong Kong (AAHK) is undertaking a major expansion to transform Hong Kong International Airport into a Three-Runway System (3RS).

March 6, 2026

Hilton Head Island Airport (HXD) Terminal Improvements Program

BNP was brought on board to design the new inbound and outbound Baggage Handling Systems (BHS) for the Terminal Improvements Program at Hilton Head Island Airport.

June 23, 2025

Xi’an Xianyang International Airport (XIY) New Terminal 5 Baggage Handling System

BNP has been engaged to design the Baggage Handling System (BHS) for the new terminal. This scope includes the development of both concept and detailed designs for all baggage systems, integration of the GTC into the terminal’s baggage network, and planning for future connectivity to a satellite terminal.

June 23, 2025

Daniel K. Inouye International Airport (HNL) Terminal 1 and 2 Baggage Handling System Improvements

As the first step in a major DOT-A initiative to transform baggage handling at Honolulu’s Daniel K. Inouye International Airport, Phase 1 of the Baggage Handling System Improvements project marks a critical leap forward.

June 23, 2025

New Inbound and Outbound BHS in New Terminal at Louis Armstrong International Airport (MSY)

Louis Armstrong International Airport, Leo A Daly Architects, in coordination with the Crescent City Aviation Team, obtained BNP’s services to design and develop a new Baggage Handling System (BHS).

June 23, 2025

Chicago O’Hare International Airport (ORD) Terminal 5 BHS Redevelopment

BNP was the Baggage Handling System (BHS) design lead for Muller & Muller, Ltd. and the Chicago Department of Aviation, delivering improvements to the Chicago O’Hare International Airport Terminal 5 BHS.

June 23, 2025

Brisbane Airport (BNE) Expansion and Security Upgrade Projects

Since 2019, BNP has been retained by the Brisbane Airport Corporation (BAC) for a number of studies, including both small and large projects.

BNP Associates, Inc. is the worldwide leader in providing specialized consulting services to the air transportation and logistics industries. 

© 2026 BNP Associates, INC. all rights reserved