Terminal Modernization Project at Pittsburgh International Airport (PIT)
Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise supporting design review, TSA compliance, commissioning, and operational readiness for the Terminal Modernization Program.

Overview
The Pittsburgh International Airport (PIT) Terminal Modernization Program (TMP) is a 632,000‑square‑foot terminal expansion and renovation project delivering a new three‑level facility through redevelopment of the existing Airside Terminal. The program modernizes passenger processing, airline operations, and baggage handling infrastructure to support long‑term operational efficiency and growth.
Project Details
The Terminal Modernization Program includes the construction of a new three‑level terminal facility comprising a ground level, concourse level, and mezzanine addition. The project delivers 51 airline gates with passenger boarding bridges, a multi‑use parking garage with rental car services, a new roadway system, a cell phone lot, and long‑term surface parking.
As a critical member of the Project Management Office (PMO) team, Studdiford Technical Solutions, LLC (STS) provides BHS subject matter expertise throughout the design and construction phases. STS supports design and construction documentation reviews and advises the airport authority on technological advancements for incorporation into the baggage handling system. This includes early‑stage discussions and presentations with airport stakeholders focused on the use of predictive analytics and Permanent Magnet Motors (PMM) to improve system efficiency and long‑term performance.
Throughout design and construction, STS provides recommendations for BHS RFIs and submittal reviews and interfaces directly with the airport authority to ensure stakeholder input is incorporated into decision‑making. The project includes the design and installation of a full turnkey inbound and outbound baggage handling system within a greenfield terminal expansion.
The overall scope of services includes oversight of all BHS and CBIS design for TSA compliance, monitoring of BHS contractor performance, technology recommendations, Operational Readiness, Activation & Transition (ORAT) support, bid package development oversight, and detailed commissioning to support successful system startup and operational readiness.
- Project Start
- 2018
- Client
- Jacobs Engineering; Allegheny County Airport Authority
- Scope of Service
- BHS and CBIS design review (design and construction documentation)
- Technology evaluation and advisory
- TSA compliance oversight
- Bid and Contract Management
- Project management
- Contractor monitoring
- ORAT support
- Commissioning
- Region
- North America
More Project Success Stories

Asia
Changi International Airport (SIN) Terminal 5 Baggage Handling Systems
BNP has been engaged by Changi Airport Group (CAG) to provide consulting services for the new Baggage Handling System (BHS) at the new Terminal 5, as part of Changi International Airport’s expansion plans.

North America
George Bush Intercontinental Airport (IAH) Terminal B Transformation
In 2023, United Airlines and the Houston Airport System selected PGAL as the Prime Consultant and Architect of Record to design the new Terminal B facility at George Bush Intercontinental Airport (IAH).

Latin America/Caribbean
A-CDM Technical Assistance at Aeropuerto Internacional Benito Juárez (MEX)
Airport Gurus provided independent technical advisory services to support the implementation of an Airport Collaborative Decision Making (A‑CDM) system at Aeropuerto Internacional de la Ciudad de México (AICM).
Partnering for Results: From Mega-Projects to Mid-Sized Success.
While building on our strong reputation, we aim to showcase our ability to deliver cost-effective solutions for mid-sized projects, educating clients on the latest technologies and ensuring their long-term success.