Terminal 2 BHS DeviceNet Replacement at Oakland San Francisco Bay Airport (OAK)
Studdiford Technical Solutions, LLC (STS) managed the modernization of the Terminal 2 baggage handling system through controls upgrades, commissioning, and implementation oversight.

Overview
The Terminal 2 BHS DeviceNet Replacement project at Oakland San Francisco Bay Airport modernizes the existing baggage handling system by replacing obsolete DeviceNet controls architecture with a contemporary Ethernet‑based solution. The upgrade improves system reliability, maintainability, and scalability to support future passenger growth and ongoing TSA screening requirements.
Project Details
The project upgrades the Terminal 2 Baggage Handling System (BHS) by replacing the outdated DeviceNet network with an EtherNet/IP‑based architecture for the Lower‑Level Controls (LLC) network. The modernization enhances key BHS components within the Checked Baggage Inspection System (CBIS), Checked Baggage Resolution Area (CBRA), and ticket counter subsystems, addressing the operational challenges associated with obsolete DeviceNet hardware.
Studdiford Technical Solutions, LLC (STS) performed a comprehensive retro‑commissioning assessment of the entire Terminal 2 BHS to identify deficiencies impacting throughput, energy efficiency, mechanical performance, and compliance with TSA Planning Guidelines and Design Standards (PGDS). The assessment produced actionable recommendations to improve overall system reliability and operational efficiency.
In addition to the retro‑commissioning effort, STS provides program management and oversight for the implementation of the DeviceNet Replacement. Services include monitoring contractor design and installation activities, reviewing submittals, responding to RFIs and RFVs, managing the project schedule, performing electrical static and functional commissioning, and coordinating Integrated Site Acceptance Testing (ISAT) with the Transportation Security Administration (TSA), Southwest Airlines, and the Port of Oakland. STS also facilitates Owner–Architect–Contractor (OAC) meetings to maintain alignment among all stakeholders and support successful project execution.
- Project Start
- 2023
- Client
- Southwest Airlines
- Scope of Service
- Program management
- Retro-commissioning assessment
- Contractor design and installation monitoring
- ISAT coordination
- Project Management
- Region
- North America
More Project Success Stories

Asia
Changi International Airport (SIN) Terminal 5 Baggage Handling Systems
BNP has been engaged by Changi Airport Group (CAG) to provide consulting services for the new Baggage Handling System (BHS) at the new Terminal 5, as part of Changi International Airport’s expansion plans.

North America
George Bush Intercontinental Airport (IAH) Terminal B Transformation
In 2023, United Airlines and the Houston Airport System selected PGAL as the Prime Consultant and Architect of Record to design the new Terminal B facility at George Bush Intercontinental Airport (IAH).

Latin America/Caribbean
A-CDM Technical Assistance at Aeropuerto Internacional Benito Juárez (MEX)
Airport Gurus provided independent technical advisory services to support the implementation of an Airport Collaborative Decision Making (A‑CDM) system at Aeropuerto Internacional de la Ciudad de México (AICM).
Partnering for Results: From Mega-Projects to Mid-Sized Success.
While building on our strong reputation, we aim to showcase our ability to deliver cost-effective solutions for mid-sized projects, educating clients on the latest technologies and ensuring their long-term success.