E-Commerce Facility at Addis Ababa Bole International Airport (ADD)
BNP was retained by Ethiopian Airlines to provide a conceptual design, validate the detailed design and review of shop drawings, provide construction administrative services on-site, manage the installation, and provide testing and commissioning, as well as closeout, support during the handover of t

Overview
Ethiopian Airlines provides logistics services for international goods in Africa, Asia, and South America, as well as some domestic goods. They currently operate a cargo terminal at Addis Ababa Bole International Airport, which has an annual processing capacity of 600,000 tons. With the increasing development of aviation logistics, Ethiopian Airlines plans to establish its logistics hub status in Africa by constructing an E-commerce Facility and sharing the logistics pressure of the existing Cargo terminals.
BNP’s Role
BNP was retained by Ethiopian Airlines to provide a conceptual design, validate the detailed design and review of shop drawings, provide construction administrative services on-site, manage the installation, and provide testing and commissioning, as well as closeout, support during the handover of the new E-Commerce Facility. Construction of the E-Commerce facility is ongoing and is expected to be completed in early 2024.
PROJECT DETAILS
Facility Capacity and Features
The new facility is adjacent to Cargo Terminal 2 and has an E-Commerce processing capacity of 150,000 tons annually.
- Seven airside interfaces are connected to a Unit Load Device (ULD) storage system capable of storing up to 500 ULDs.
- Dual Elevating Transfer Vehicles (ETVs) distribute ULDs to and from eight (8) lowerable workstations, two of which are reserved for future expansion, with the capability to utilize an additional seven slave pallet positions as required.
- Dual cross-belt sorters with 20 induction units deliver parcels via 62 chutes to their respective destination.
- The facility has incorporated a manual storage solution for 600 euro pallets.
- Nine truck docks will transport goods to and from the facility at the landside interface.
- Project Start
- 2021
- Client
- Ethiopian Airlines, Addis Ababa Bole International Airport (ADD)
- Scope of Service
- Conceptual Design
- Detailed Design Review
- Shop Drawing Review
- Construction Administration
- Testing & Commissioning
- Region
- Africa
More Project Success Stories

Asia
Changi International Airport (SIN) Terminal 5 Baggage Handling Systems
BNP has been engaged by Changi Airport Group (CAG) to provide consulting services for the new Baggage Handling System (BHS) at the new Terminal 5, as part of Changi International Airport’s expansion plans.

North America
George Bush Intercontinental Airport (IAH) Terminal B Transformation
In 2023, United Airlines and the Houston Airport System selected PGAL as the Prime Consultant and Architect of Record to design the new Terminal B facility at George Bush Intercontinental Airport (IAH).

Latin America/Caribbean
A-CDM Technical Assistance at Aeropuerto Internacional Benito Juárez (MEX)
Airport Gurus provided independent technical advisory services to support the implementation of an Airport Collaborative Decision Making (A‑CDM) system at Aeropuerto Internacional de la Ciudad de México (AICM).
Partnering for Results: From Mega-Projects to Mid-Sized Success.
While building on our strong reputation, we aim to showcase our ability to deliver cost-effective solutions for mid-sized projects, educating clients on the latest technologies and ensuring their long-term success.