Columbia Metropolitan Airport (CAE) Passenger Boarding Bridge Improvements – Phase 2
In 2024, the Richland Lexington Airport District chose to complete the second phase of its Passenger Boarding Bridge (PBB) Improvement Project.

Overview
In 2024, the Richland Lexington Airport District chose to complete the second phase of its Passenger Boarding Bridge (PBB) Improvement Project. Foth Infrastructure Solutions has retained BNP Associates, Inc. and Miller Dunwiddie Architecture for design and construction administration services.
This phase of the project will include the replacement of two existing tele-radial PBBs with new mechanical/electrical apron drive PBBs. It will also include the addition of another new PBB (a total of three) to convert an existing gate from ground loading of passengers to a PBB loading process.
PROJECT DETAILS
Design Scope
The design scope stages followed the standard format:
- Concept Design
- Preliminary Design
- Design Development
- Tender Stage
Project Components
In addition to the three new PBBs, this project will include:
- One new fixed walkway
- Refurbishment of two existing walkways
- New 400 Hz ground power units and cable hoists at all new PBBs
- One new Pre-Conditioned Air (PCA) unit with hoses
- Relocation of two existing PCA units to the new PBBs
- Rooftop air conditioning/heating units for all three new PBBs
- A new motorized bag lift in the new walkway
- New potable water cabinets
Control System Upgrades
We are also strongly considering upgrading the existing PBB operator control consoles with:
- New PLC-controlled operator consoles and screens to match the new PBBs
- Wireless 5G network interface to monitor fleet and gate management, as well as the status of the PBBs, 400 Hz power units, and PC air equipment. This information would be accessible to operators via cell phones, tablets, or computer workstations.
Construction Administration Services
Construction Administration Services will include:
- Submittal reviews
- Onsite PBB and equipment physical inspections
- BNP-witnessed contractor commissioning
- Owner representative substantial completion commissioning
- Aircraft fit tests where stop marks were revised or are new
- Project Start
- 2024
- Client
- Richland Lexington Airport District
- Scope of Service
- Conceptual Design
- Design Development
- Bid Documentation
- Construction Administration
- Testing & Commissioning
- Region
- North America
More Project Success Stories

Asia
Changi International Airport (SIN) Terminal 5 Baggage Handling Systems
BNP has been engaged by Changi Airport Group (CAG) to provide consulting services for the new Baggage Handling System (BHS) at the new Terminal 5, as part of Changi International Airport’s expansion plans.

North America
George Bush Intercontinental Airport (IAH) Terminal B Transformation
In 2023, United Airlines and the Houston Airport System selected PGAL as the Prime Consultant and Architect of Record to design the new Terminal B facility at George Bush Intercontinental Airport (IAH).

Latin America/Caribbean
A-CDM Technical Assistance at Aeropuerto Internacional Benito Juárez (MEX)
Airport Gurus provided independent technical advisory services to support the implementation of an Airport Collaborative Decision Making (A‑CDM) system at Aeropuerto Internacional de la Ciudad de México (AICM).
Partnering for Results: From Mega-Projects to Mid-Sized Success.
While building on our strong reputation, we aim to showcase our ability to deliver cost-effective solutions for mid-sized projects, educating clients on the latest technologies and ensuring their long-term success.